Weir Archer Athletics and Fitness Centre, UK
Completion at the track and field of the Weir Archer Athletics and Fitness Centre, using LEDTURE 10pcs Model A 1440W and 12pcs 960W Floodlights on 8pcs new raise and lower poles.
Installation Time:
January, 2024
Location:
Kingston upon Thames, UK
Installed Luminaire:
Model A